بانک مقالات

زمانبندی جریان بهینه چندین خط تولید برای تولید پیش ساخته

Optimized flowshop scheduling of multiple production lines for precast production

سال انتشار : 2016

تعداد صفحه : 9

کلیدواژه ها: Precast production, Flowshop scheduling, Optimization, Genetic algorithm

   دانلود 

ABSTRACT

The current approach in practice to produce the flowshop schedules of precast production is the dispatching rule technique, which does not guarantee optimal schedules. Some researchers have developed models for a single production line to optimize the scheduling, inwhich Genetic Algorithm(GA) is used to obtain the solution. However themodels cannot be used for multiple production lines.Moreover, some optimization constraints and objectives were missing in the models, such as avoiding frequent type change of precast components during production. Both issues hinder their work to be applied to real precast plants. To overcome the problem, this paper proposes a Flowshop Scheduling Model of Multiple production lines for Precast production (MP-FSM) and develops a corresponding optimization approach to facilitate optimized scheduling by using GA. The approach was validated preliminarily by comparing with traditional scheduling approaches. The results demonstrated that optimized schedules can be obtained by using the proposed approach

زبان فایل

مجلات و ژورنال های بین المللی

Elsevier

ترجمه

نوع فایل

رایگان

سال انتشار

2016

دیدگاهها

هیچ دیدگاهی برای این محصول نوشته نشده است.

اولین نفری باشید که دیدگاهی را ارسال می کنید برای “زمانبندی جریان بهینه چندین خط تولید برای تولید پیش ساخته”

نشانی ایمیل شما منتشر نخواهد شد.